Big Cypress Wastewater Treatment Plant

Delivering A Plant Upgrade for Big Cypress WWTP

 

Big Cypress Waste Water Treatment PlantBig Cypress Waste Water Treatment Plant

R2T provided owner representation for the Big Cypress Wastewater Treatment Plant, Big Cypress Reservation, Florida.

The project included a Sequencing Batch Reactor (SBR) at the Big Cypress Reservation to meet future demands and current effluent discharge regulations.

The facilities for this project consisted of:

  • Extensive site modifications to meet geotechnical foundation requirements and to protect from flooding.
  • Treatment building housing chemical feed facilities, administrative offices and electrical room.
  • Bulk chemical feed and storage facility.
  • SBR and filtration facilities.
  • Sludge thickening. 
  •  Percolation ponds for plant effluent final disposal. 
  • R2T provided overall project management and owner representation role.

 

Below the fold: 

 

Our responsibilities included:

  • Overall project management.
  • Cost and schedule monitoring and control on behalf of the STOF.
  • Development and implementation of an extensive document control system.
  • Coordination, monitoring of direct purchase of several large equipment packages that resulted in tax savings to the STOF.
  • Utilization of technical support by R2T staff to resolve technical deficiencies and design related site issues.
  • On site full time R2T staff to monitor construction activities.
  • Review of pay requests and review and monitoring of project schedule.
  • Coordination of soil and concrete testing and threshold inspection.
  • Overall Quality assurance effort
  • Coordination between engineer of record and general contractor.
  • NPDES monitoring and compliance.
  • Coordination with STOF staff and existing water and waste water systems.
  • Comprehensive O&M manual
  • Start up, training and close out documents
  • Coordination with all close out activities such as certification of installation, training, functional testing, full scale and demonstration testing.
  • Coordination and implementation of a major revision to the percolation pond location and design due to actual field conditions that required complete relocation and modification of the pond elevations.
  • Assistng with the SBR and filtration equipment to recognize cost savings associated with the alternate equipment proposed.

 

[Read More]

 

Our responsibilities included:

  • Overall project management.
  • Cost and schedule monitoring and control on behalf of the STOF.
  • Development and implementation of an extensive document control system.
  • Coordination, monitoring of direct purchase of several large equipment packages that resulted in tax savings to the STOF.
  • Utilization of technical support by R2T staff to resolve technical deficiencies and design related site issues.
  • On site full time R2T staff to monitor construction activities.
  • Review of pay requests and review and monitoring of project schedule.
  • Coordination of soil and concrete testing and threshold inspection.
  • Overall Quality assurance effort
  • Coordination between engineer of record and general contractor.
  • NPDES monitoring and compliance.
  • Coordination with STOF staff and existing water and waste water systems.
  • Comprehensive O&M manual
  • Start up, training and close out documents
  • Coordination with all close out activities such as certification of installation, training, functional testing, full scale and demonstration testing.
  • Coordination and implementation of a major revision to the percolation pond location and design due to actual field conditions that required complete relocation and modification of the pond elevations.
  • Assistng with the SBR and filtration equipment to recognize cost savings associated with the alternate equipment proposed.