Brighton Water Treatment Plant
Managing Construction of the Brighton WTP
Brighton Water Treatment Plant
R2T provided overall construction management and inspection services for the Brighton Water Treatment Plant, Brighton Reservation, Florida.
The project consisted of the construction of a membrane softening water treatment plant at the Brighton Reservation to meet future demands and current drinking water regulations.
The facilities for this project included:
- Construction and redevelopment of 7 ground water wells.
- Several miles of raw water piping.
- 70 acres of spray field with piping, valves and controls.
- Treatment building housing micro filtration, softening nano-filtration membranes, chemical feed facilities, administrative offices and electrical room.
- Bulk chemical feed and storage facility.
- Degasifiers, transfer pump station and wet well.
- Finished water storage and high service pump station.
- 8 MG of Brine and dilution storage tanks.
- Extensive site modifications to provide access, flood protection and meet geotechnical requirements.
Below the fold:
R2T Services for this project included:
- Overall project management
- Cost and schedule monitoring and control
- Development and implementation of an extensive document control system
- Coordination, monitoring of direct purchase of several large equipment packages that resulted in tax savings
- Utilization of technical support by R2T staff to resolve technical deficiencies and design related site issues
- On site full time R2T staff to monitor construction activities
- Review of pay requests and review and monitoring of project schedule
- Coordination of soil and concrete testing and threshold inspection
- Overall Quality assurance effort
- Coordination between engineer of record and general contractor
- NPDES monitoring and compliance
- Coordination with staff and existing water and wastewater systems
- Comprehensive O&M manual
- Start up and function testing
- Operation during acceptance testing
- Training and close out documents
R2T Services for this project included:
- Overall project management
- Cost and schedule monitoring and control
- Development and implementation of an extensive document control system
- Coordination, monitoring of direct purchase of several large equipment packages that resulted in tax savings
- Utilization of technical support by R2T staff to resolve technical deficiencies and design related site issues
- On site full time R2T staff to monitor construction activities
- Review of pay requests and review and monitoring of project schedule
- Coordination of soil and concrete testing and threshold inspection
- Overall Quality assurance effort
- Coordination between engineer of record and general contractor
- NPDES monitoring and compliance
- Coordination with staff and existing water and wastewater systems
- Comprehensive O&M manual
- Start up and function testing
- Operation during acceptance testing
- Training and close out documents